Wednesday, February 19, 2020

New Bot For Next Weekend

A bit late, but I'm updating a couple posts leading up to MakerX Columbus Combat 2020 next weekend. First of all I'd like to recap Taproom Tapout and what it means for me.

Taproom Tap Out was a fairly successful tournament with 2 strong wins, 1 good loss, and 1 fight of me getting my shit tossed by a Weta. Since I already posted the video I don't feel like there is much more I can add that would be worth while.

The biggest thing after this tournament is that I no longer have any spare metal parts for Honeycomb. I've been working hard to get my new bot up and running.



The bottom image is not a fully accurate representation of the new design, didn't have a most recent render on hand.

List of changes: Old -> New

  • 3D printed weapon motor mount -> aluminum weapon motor mount now attached to the frame with aluminum standoffs
  • 3" total height -> 2-3/8" total height
  • 2-1/4" chassis height -> 1-1/4" chassis height
  • live 3/8" aluminum weapon shaft -> dead 5/16" grade 8 steel weapon shaft (also changed to roller bearings instead of ball bearings)
  • side plates 1/4" aluminum -> 1/8" titanium
  • 3" acrylic wheels -> 2-3/8" banebots wheels
  • sprocket and chain -> belts and pulley
  • polycarbonate wedge -> ar500 forks
  • 4140 weapon teeth -> ar500 weapon teeth
  • drum design -> new hex drum design which should be robust and significantly heavier
  • no z-support standoffs -> z-support standoffs to help make the robot more robust between the top and bottom plates
  • flat back plate -> rounded back-plate so I can no longer get stuck on my back.
  • no side armor -> side armor to protect the shaft mounting point
Hopefully all of these changes will solve reliability issues, up damage, and potentially lead to more consistent performance across tournaments and throughout the day at tournaments. The bot was also redesigned to be 100% laser cut with the only part needing to be machined being the aluminum drum that the teeth mount on. I am also planning on completely removing the lexan wedge option and plan on potentially introducing a large fork/full wedge option to deal with some of the bigger spinners that have historically given me trouble in competitions. This would involve removing the weapon and all related sub assemblies and replacing all that weight with said wedge/forks. This modular option will not be ready for the next tournament, but this new design was created with this potential option in mind.

Sunday, December 29, 2019

Engineered For Destruction 8 Tournament Recap

The Tournament

Arrival and Setup

For this tournament we were headed down to Nashville, Tennessee's Adventure Science Center. We ended up getting there around 10:00AM Saturday morning of the event. We unloaded the car, and moved inside to the room that the tournament was going to be hosted in. We got set up at our table and got the bot ready for weigh in.
Ready for a tournament!!!

The box was pretty cool, with a pit on one side and a free spinning disk in the middle. So when attempting to accelerate tangent to the disk, the disk will just spin out and cause you to not move where you are expecting to, or when driving over the disk it may create variable driving conditions that few drivers are used to.
The box we will be fighting in.
I compiled all the fights and the rumble together into one video. Below the video I have some comments and thoughts I had about each fight. Due to the size of the bracket there were a max of 4 fights for the day. Sorry for video quality of the rumble, we didn't have video stabilization on :(


Fight 1 Honeycomb vs Tweetle - Quarter Finals

Tweetle is an overhead saw bot with a wide base and aluminum scrapes on the front. However, I noticed early on that the center 2 forks actually ride up a bit above the ground, and I suspected if I just went head on with my wedge, I would most likely be able to get underneath him and knock him around and really control the fight. All goes pretty well and I end up winning this fight with no issues. Only thing to do is recharge the battery.

Fight 2 Honeycomb vs Pyramid of Death - Semi Finals

Pyramid of Death is exactly what it sounds like, a pyramid shaped robot that is very low to the ground on all sides, and on one side it actually has a ground scraping metal wedge. I figured that my wedge could get under it on the sides without the metal wedge, as they were not actually touching the ground. Additionally, the drive train for Pyramid of Death seems relatively powerful, but slow and lacking wheel traction, so I think if I can get to one of the sides I should be able to push POD around and really control the fight. It ends up going well, I end up getting tearing up his wedge a bit and close out the fight with a nasty hit which completely flips POD over and he gets counted out.

Fight 3 Honeycomb vs Tweetle Round 2 - Finals

Tweetle ends up making it all the way through the losers bracket and we end up meeting again in finals. Over all my plan going into this match was about the same. Part way through the match however, I break my mid plate which holds my two bearing plates the proper distance from each other so my weapon shaft doesn't fall out. The two bearing plates separate from each other enough for the weapon shaft to fall out. This renders my weapon useless for the rest of the match, and I lose this match to judges decision.

Fight 4 Honeycomb vs Tweetle Round 3 - Finals

Since I was undefeated for the day, Tweetle had to win 2 times since we were in a double elimination bracket. After the break in the lasts match I pressed the two halves together and wrapped duct tape around it so that it wouldn't come apart again. I think as long as I continue to use the 3D printed center part, I may continue to just tape it as these 3D printed parts are good with compressive forces, but are pretty weak under high tensile forces, shear, and shock. So maybe the tape will be good insurance that the two sides wont come apart in the future even if the mid-plate breaks like it did during fight 3. With the weapon fully working, I was able to get a lot of good hits off during this last match. Tweetle ends up driving into the pit after a while. This is the final round and I ended up winning the tournament 3-1.

3lbs Rumble

The remaining functional bots took it to the arena to bout it out for 5 minutes. During this shoot we forgot to turn on our image stabilization so during some refocusing of the camera it ended up being pretty shaky for the majority of the match. :(

The Recap

Just like last time I think I still have some of the same issues with just material properties. Currently, I am designing a new 3lbs robot, and when I go to have parts cut for the new bot, I might have some new parts cut for Honeycomb to make it more reliable.

I think I could also cut down the size of my battery to 850mah, 650mah, or possibly even lower. Currently, I'm running a 1000mah 3S battery which is definitely over-spec'd for this bot. I could probably up the power of this bot by cutting down to a 850mah or a 650mah, but up to 4 cell battery for higher weapon speeds. Need to do some rough calculations, but current estimate is I can definitely reduce to a 850mah battery, possibly the 650mah.

Overall, this was a really fun tournament that wasn't too far away, hope to make my way back for the next tournament hosted by MTRAS. (Also love coming down for the BBQ :P)

1st Place!!!

Wednesday, October 23, 2019

R&F Tournament Recap

This is pretty late, but I have been very buy with the start of the school year. Without wasting anymore time lets get into it. For this tournament me and RJ traveled to Wilkes-Barre, Pennsylvania. We left home about 10PM Friday evening, with plans on arriving there at about 8-9AM Saturday morning. Travel goes well without a hitch, and we end up arriving at around 8:30AM.

This tournament was hosted by Raymour and Flanigan furniture store, and they had the box set up in the middle of the Store, and it was the first thing you saw when walking in to the store. Very cool setup with a lot of couches and chairs surrounding the box for people to sit and watch the event.
The box setup in the main lobby of the store
When getting there, they had us move around back to their warehouse area which is where they had us set up pits.
I ended up wearing my old high school robotics shirt, represent.
Me rebuilding the weapon assembly for the 4th time that morning.
The first fight of the day was against Captain Doom. Captain doom had 5 ground scraping forks on the front of their bot and a powerful drive train that made them very difficult to bully around the box. Without my primary weapon this match was going to be near impossible to win due to their more powerful drive train and low ground clearance. At the end of the match however, we have a giant collision that ends up knocking something lose in Captain Doom and they are rendered immobile. We win the match and qualify for the round of 8.


Since Captain Doom was just a push bot, we didn't have any repairs to do outside of charging the batteries. This left us a lot of time to try and figure out why our weapon wasn't spinning up. Upon the recommendation of another builder (I can't recall who) we lowered the kv of our brushless motor and swapped from a 3200kv motor to a 1100kv motor.
Me rebuilding the weapon assembly yet again.

Finally ready, with the weapon working.

For the next match of the day, we were facing Mondo Bizarro. Mondo has a very nasty vertical spinner on the front, but a relatively weak drive train. So for this match I wanted to stay away from the front of his bot and get around to the sides and the back. However, this did not go quire as planned, and I took a lot of early hits that ultimately led to the failure of my weapon. This fight won me "Most Destroyed".

After it was all said and done, we were unable to continue on the day. We finished top 8 and got this cool gif.

cool gif

Overall Thoughts:

I think performance was pretty okay, but had issues with reliability off the bat. Below are a few thought on how to change the design and how to prepare for future competitions next calendar year.
  • Remove all 3D printed parts from the design. They are pretty rigid, but tend to snap and break instead of losing chunks and chipping. Want to switch over to UHMW for the mid and back plate, or possibly 2 different materials. The logic being that the back is subjected to more hits, and the mid is subjected to more torque and sheer force as the different sides get hit. Will probably get completed after the November Tournament in Virginia.
  • Make the permanent switch over to a lower kv motor. Maybe not 1100kv as that seems a little bit too low, but under 2000kv. However, all I have on hand are 1100kv, I'll see if I can find some 14-18 hundred kv motors before the next tournament. (Will probably get completed before the next competition in 2 weeks)
  • Practice driving, I really shot myself in the foot not practicing driving more, with that being very apparent in the Mondo match.

Monday, September 9, 2019

Last Minute Changes and Other Notes


New Design Error Discoveries

When replacing the set screws for the wheel hubs, I noticed that the hole in the hub isn't actually lining up with the slots in the drive shaft and the set screws are actually sitting outside of the slot. So, I'm going to do a slight rearrangement of the wheel assembly to see if I can get the slots to line up with the set screw, and if not I'll grind the slot slightly wider to accommodate. I suspect that this was the reason why I lost so many wheels in my first competition, since the set screws weren't in the slots, any loosening of these screws would cause the wheels to come off with enough centripetal force.

Also related to the wheel assembly is that the mounting hubs are actually not screwed in all the way due to the short length of the screws used to screw it in. I believe at some point in the design process I changed the depth of the counter sink and never adjusted the screw size to accommodate for the new longer distance the screw has to reach to be fully threaded into the mounting hub. If I have the time I'm going to make my way over to the hardware store to get a 1/4" or 5/16" screw to replace the current 3/16". I didn't necessarily have issues with the hub ever coming lose in the last event, but better safe than sorry.

Additionally the teeth on the weapon are only held in place with zip ties working kind of like a shaft collar. I think I'm going to try and replace them with larger zip ties to get a more effective collar on the shaft, possibly add some sort of high friction item on it so that it really chokes the shaft and doesn't slide.

Update On Current Status

With the competition coming up in just a few short days, I'm getting down to the wire here. I still have to manufacture 1 more wedge, I don't think I'll need more than 2 for the whole weekend. However, if time allows I will try to cut out one more so that I can have a total of 3 for the weekend. I currently have only 1 extra back plate, but I'm not really worried about any of the bots at this event having the destructive power to destroy the plate outside of Silent Spring since most of them are wedge bots, or other vertical spinners.

Thursday, August 29, 2019

All Hardware Came In: Time To Start The Final Build Before R&F

Yesterday evening the Blue Loctite, vice grips and brightly colored duct tape to mark my vice girps came in the mail. This morning I made my way over to Kleindorfer's hardware. They have consistently been a great help to help me find the hardware that I need, with fast and professional customer service. They helped me locate replacement screws for a few different applications around the bot which include...

  • Wheel set screws - will lock
  • Drive motor mount screws - will lock
  • Shaft collar screws - will not be locked
  • Weapon motor mount set screw - will lock
I was able to get most of them in a higher grade than what came with the parts originally to hopefully, when paired with Loctite, hold up better to repeated screwing.

Today I was also able to print out the outline for the new wedge, the new angle of the wedge even on paper is looking a lot better than what it used to and I will hopefully have it all cut out and ground down by Sunday.

Tuesday, August 27, 2019

Event and Rebuild Update

Events

Officially signed up for R&F Robot Fight 2019 (9/14/19) and Hill City Robot Combat 2019 (11/9/19). Was unable to sign up for NERC Franklin Institute 2019.

Rebuild

Currently: The bot is completely rebuilt, have run a weapon and drive test and everything seems to be working. Updated the circuit to allow myself to more easily turn off and on the bot (and make it compliant with safety protocol.

To Do: Cut and grind new wedge and backup wedge, buy stainless steel replacement screws for all set screws and shaft collars, buy loctite and apply to appropriate areas.